Paint! |
Scaffolding up on water tower |
Sanding the plaster to prep for paint on 2nd floor |
Ready for paint |
Paint! |
Lintel repair and brick cleaning |
Drywall continues |
windows |
The floor has been poured in the gym |
Door frames are going in the over the drywall |
Floor is poured around the elevator shaft |
Priming |
Drywall and primer |
tile in the bathroom |
Hvac system |
hvac |
Fire suppression systems and electrical |
Another floor the concrete is in around the elevator shaft |
drywall continues |
windows |
windows |
staircase |
staircase and lots of workers |
South face windows |
Cleaning and repair , getting ready for windows on the north side |