Tuesday, May 2, 2017

May 2,2017 Building Update

Drywall continues
windows





The floor has been poured in the gym


Door frames are going in the over the drywall

Floor is poured around the elevator shaft

Priming 

Drywall and primer

tile in the bathroom

Hvac system

hvac


Fire suppression systems and electrical

Another floor the concrete is in around the elevator shaft

drywall continues

windows 

windows


staircase

staircase and lots of workers


South face windows
                             

Cleaning and repair , getting ready for windows on the north side

No comments:

Post a Comment