Demolition Update - 10.10.2018


Demolition of the vacant building on our campus is underway. Our contractors were able to take down the unstable wall near the bridge, which was their first priority. As previously mentioned, the demolition contractor and school administration are working together to make sure that things are done safely and with consideration for our community. Items such as dust control (i.e. water spray) during active demolition, coordinating recess.timing with construction worker lunch breaks, and ensuring all appropriate environmental verifications were taken prior to commencing the work.

A storage container (a recycled shipping container) will be placed in the corner of the property and used for storage of salvaged materials.  As part of getting permission to demolish the building from various Federal, State and local agencies, we have committed to preserving certain historic elements.  This includes lettering on the side of the building facing the railroad track, bricks, sandstone and some wood beams.  These items along with some materials salvaged during the renovation of the warehouse building will be stored in this container until the final plan for the entire campus is developed.

Thanks again for your ongoing cooperation during this time.  




No comments:

Post a Comment