| Paint! |
| Scaffolding up on water tower |
| Sanding the plaster to prep for paint on 2nd floor |
| Ready for paint |
| Paint! |
| Lintel repair and brick cleaning |
| Drywall continues |
| windows |
| The floor has been poured in the gym |
| Door frames are going in the over the drywall |
| Floor is poured around the elevator shaft |
| Priming |
| Drywall and primer |
| tile in the bathroom |
| Hvac system |
| hvac |
| Fire suppression systems and electrical |
| Another floor the concrete is in around the elevator shaft |
| drywall continues |
| windows |
| windows |
| staircase |
| staircase and lots of workers |
| South face windows |
| Cleaning and repair , getting ready for windows on the north side |